The challenge

The refiner wanted to run heavier, lower-cost crudes without losing capacity. Operators suspected limits in the preheat train, furnace and column internals but had no calibrated model to confirm them.

Our scope

  • Calibrated steady-state simulation
  • Preheat train pinch analysis
  • Column hydraulics and tray rating
  • Relief and flare checks for new cases
  • Modification cost estimates

Our approach

We built a simulation model calibrated against plant data, then tested each crude blend and throughput case to rank the real bottlenecks. Energy savings from preheat train changes were evaluated at the same time.

  • Exchanger rating in HTRI
  • Relief scenarios checked to API 520 / 521
  • Payback analysis for each modification

The outcome

The study identified a short list of modifications with fast payback, including exchanger additions that reduce furnace duty, and set out a plan to implement them in the next turnaround.

Scope of work

  • Process simulation
  • Pinch analysis
  • Column rating
  • Relief checks
  • Cost estimates

Gallery

Let's Start

Ready to start your next project?

Share your requirements and our engineering team will come back with a tailored proposal.

  • ISO 9001:2015 Certified
  • Offices in USA & India
  • Codes & Standards Compliant