AACE Cost Estimate Classes Explained for Process Plant Projects
What AACE Class 5 to Class 1 estimates mean, how accurate each one is, and what engineering definition you need to produce them.
A practical guide to the front-end loading phases of a process plant project — what each phase produces, how accurate the estimate is, and when to move to the next stage.
Read articleWhat AACE Class 5 to Class 1 estimates mean, how accurate each one is, and what engineering definition you need to produce them.
How laser scanning and intelligent 3D modelling reduce rework and site visits on brownfield modifications — and what to specify to get a usable model.
A plain-language guide to deciding which lines need formal stress analysis, and what the analysis checks.
Why hazard and operability studies and safety integrity level assessments belong in FEED, and how to run them effectively.
What to look for at each 3D model review milestone so problems are fixed in the model, not on site.
How engineering teams can identify repetitive CAD tasks worth automating and build tools that designers actually use.
An introduction to amine-based carbon capture for cement, steel, refining and power — how it works and what drives cost.
A comparison of the two most common electrolyser technologies for green hydrogen projects and the factors that should drive the choice.